![]() ![]() Completed checklists should be collected and kept on file within the facility, as this documentation verifies that the assessments are being performed properly and on schedule, as well as that the equipment is operating both effectively and safely. Should an operator identify any issues during the pre-shift inspection, the monorail should be immediately removed from service. Assess the hoist following the appropriate checklist for electric powered and air powered hoists, hand chain hoists, and lever hoists, published by the Hoist Manufacturers Institute (HMI).Evaluate the work area for accumulation of materials and for poor lighting, both of which can cause trips and slipping.Determine if any unauthorized modifications have occurred.Check the system’s support structure, looking for bent or otherwise damaged hanger assemblies, to confirm overall operational stability. ![]()